Well on Sunday I set about digging and laying the footings. There were only 12 so I gave myself 4 hrs. 8hrs later, and under floodlights, it was completed…. Almost. Some bastard had put a 75mm stirrup in the 90mm box so I ended up one short.

The digging was easy, the leveling out, not so easy. But with Kates help, we got it all level, got a number of beers down and was mighty satisified come 8pm.