Bathroom update
Posted by jonno | Posted in Renovations | Posted on 08-07-2010
Well as I head into work on what is the earliest train I’ve ever caught (504am) I find my mind already working at full speed.
Work has been so full on over the past month as we finalise the Notes 8.5.1 package which along with renovations consumes every waking minute. Sametime 8.5 is killing me and with my nuts on the chopping board I’m really hoping the cutover from 7.5.1 to 8.5 goes smoothly.
But that’s enough about work. I’ve had my cousin around doing the plumbing for the new bathroom. He’s done a brilliant job and this weekend my list is short but important. Floors walls and bath hob.
The floor will be interesting. It involves compressed cement sheeting which is heavy so to make it a one man job it will mean cutting it up into smaller chunks which means dust.
But what’s a little dust in a house covered in it ….
That’s this afternoon. Tomorrow is the wall which I’m hoping isn’t too much trouble with the nail gun followed on Sunday by the hob. And somewhere in between is going and buying the shower rail and light.
Before and after shots on their way!

